FLIXREC
Critical Path

Critical Path

"The engineering journey to Starship and beyond."

2026 0h 34m 10.0 Movie

Overview

Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

Critical Path at a glance

Critical Path is a 2026 film, starring Justin Styer, Elon Musk and Tim Southerton. It runs for 34 minutes. TMDB users rate it 10.0 out of 10 from 1 votes.

We couldn't find Critical Path on any streaming service right now. Add it to your watchlist and check back later. If you enjoy it, try Interstellar: Nolan's Odyssey, The Director and the Jedi and Titanic: The Digital Resurrection next.

Cast

Recommendations

Interstellar: Nolan's Odyssey
7.8

Interstellar: Nolan's Odyssey

2014 Movie
The Director and the Jedi
7.4

The Director and the Jedi

2018 Movie
Titanic: The Digital Resurrection
7.9

Titanic: The Digital Resurrection

2025 Movie
The Fountainhead
6.8

The Fountainhead

1949 Movie
What We Left Behind: Looking Back at Star Trek: Deep Space Nine
7.2

What We Left Behind: Looking Back at Star Trek: Deep Space Nine

2018 Movie
The Skywalker Legacy
7.9

The Skywalker Legacy

2020 Movie
The Corporation
7.6

The Corporation

2003 Movie
The Curious Birth of Benjamin Button
7.0

The Curious Birth of Benjamin Button

2009 Movie
Battlestar Galactica
6.8

Battlestar Galactica

1978 Movie
End Game
7.1

End Game

2018 Movie

Reviews

Loading reviews...